4-1
Chapter 4 Commissioning
4.1 Step for starting measurement
Fig. 4.1.1 Step for starting measurement
NOTE:
・
Connection procedure should be referred
Chapter 3 Electrical installation
.
・
This level gauge can be configured through the keys (and display) or HART communication.
- in case of using the keys (and display) : refer to
Chapter 5 LCD and 4-Keys operation
.
- in case of using HART communication : refer to
Chapter 6 Operation by configuration software
.
Installation
Connec t i o n with transmitter
head and accessories
Confirmation
of wiring
Turn on the power
Commissioning
Confirmation
of output
Start measurement
OK
NG
OK
NG
Summary of Contents for KRG-10
Page 1: ...Document No KF13 001K Microwave Level Gauge RG 10 User s Guide...
Page 9: ...8 Blank...
Page 13: ...12 Blank...
Page 51: ...3 8 Blank...
Page 55: ...4 4 Blank...
Page 171: ...9 2 Blank...
Page 190: ...10 19 M20 1 5 Fig 10 7 6 Cable gland Only Non Ex type...
Page 193: ...11 2 Blank...
Page 197: ...12 4 Blank...
Page 199: ...Blank...