11.
Speed switching
5-16
5. Operations and
adjustment
TSC
11-1
Speed switching
While moving, you can change the speed and continue the operation without pausing by issuing
the execution command for the next program STEP No. (specify STEP No.
→
STRT ON).
If the execution command for the next program STEP No. is delayed, the operation continues
after a pause.
The acceleration and deceleration rate from the speed changing point to the next speed will be
"ACC (m/s
2
)" for the next STEP.
Note that the rate will always be "ACC (m/s
2
)" even for deceleration operation.
For STEP No. in which you will perform speed switching, set "E" to "JUMP (NO.)."
You can switch speed only in the operation mode 0, 2, and 3.
This function is not available for operations from D-STEP. (The machine always pauses.)
STEP No.
ABS / INC
Position Speed
P area A
P area B
JUMP
Comment
[mm]
[mm/s]
[mm]
[mm]
[No.]
0
ABS
60.00
80
50.00
70.00
E
STEP No.0 operation (green)
1
ABS
120.00
30
90.00
110.00
E
STEP No.1 operation (blue)
STEP No.
ABS / INC
Position Speed
P area A
P area B
JUMP
Comment
[mm]
[mm/s]
[mm]
[mm]
[No.]
0
ABS
60.00
30
50.00
70.00
E
STEP No.0 operation (green)
1
ABS
120.00
80
90.00
110.00
E
STEP No.1 operation (blue)
80mm/s
30mm/s
STEP No.0
STEP No.1
60
120
Position
[mm]
Speed
80mm/s
30mm/s
STEP No.0
STEP No.1
60
120
Speed
Position [mm]
* Some of the setting fields are omitted.
* Some of the setting fields are omitted.
Summary of Contents for TSC Series
Page 98: ...MEMO ...