
1-7
1. Introduction
TSC
1. Safety check
①
Safety statement check
→
P.1-4
②
Safety check of the installation location
→
P.2-8
③
Installation check
→
P.2-9 to 2-11
2. Preparation
①
Preparation of required devices
→
P.1-6
②
Package contents check
→
P.2-3 to 2-4
3. Installation
①
Installation environment check
→
P.2-8
②
Installation
→
P.2-9 to 2-11
4. Wiring
①
Connection between each device and
cable
→
P.3-2 to 3-25
5. Trial run and
adjustment
①
Preparation of setup tool D-STEP
(see the separate Instruction Manual of
D-STEP)
②
Trial run
→
P.5-4 to 5-18
③
Parameter setting
→
P.5-19 to 5-23
6. Setup tool setting
①
Setup tool setting
(see the separate Instruction Manual of
D-STEP)
4.
Flow until using the product
Summary of Contents for TSC Series
Page 98: ...MEMO ...