Operating Instructions
6-11
Turning Unit On (Single or Multi-temp SR-2/SR-3)
Complete the following steps to turn on the unit:
1. Press the
O
N
hard key.
NOTE: With SPECTRUM Multi-Temp applications, Zone 1 is turned on any time the host unit is turned on. Zone 1 is turned
off when the host unit is turned off.
2. The display briefly shows a Thermo King Logo as the display initializes.
NOTE: With extremely cold ambient temperatures it may take up to 15 seconds for the first display to appear.
Turning Unit On Screen Sequence
Press On Key
1.
On Key
2.
Display
1
2
DIESEL ENGINE STARTING
ARA797
Summary of Contents for SLXi Spectrum
Page 17: ...Safety Precautions 2 5 Warning Decals...
Page 18: ...Safety Precautions 2 6 Warning Decals Information Decals...
Page 74: ...Unit Description 5 30...
Page 128: ...Controller Operation 7 28...
Page 156: ...Electrical Maintenance 8 28...
Page 234: ...Refrigeration Maintenance 10 22...
Page 309: ...13 Mechanical Diagnosis TK 482 TK 486 and TK 486V Engines 13 2...
Page 316: ...Mechanical Diagnosis 13 8...
Page 322: ...Refrigeration System Diagnosis 14 6...
Page 332: ...Single Temperature Refrigeration System Diagrams 15 10...
Page 339: ...Multi Temperature Refrigeration System Diagrams 16 7...
Page 340: ...Multi Temperature Refrigeration System Diagrams 16 8...