Chapter 2 Installation
Figure 2-5.
Properly Installed Shield Cable
1. Install cable clamp into shield cover and secure. Be sure there is good electrical
conductivity between clamp and shield cover.
The following is a parts list of components in the analog output cover assembly:
Part
No.
Description
Qty.
7592
Analog output cover
1
11519
8-Position
header
2
5889
#6 Star lock washers
4
5820
6-32X3/8”
screw
4
14549
Cable
clamp
1
STARTUP
1. Turn the power on.
2. Set instrument parameters such as operating ranges and averaging times to
appropriate settings. For more information about instrument parameters, see
Chapter 3, “Operation.”
3. Before beginning actual monitoring, perform a multipoint calibration as described in
Chapter 4, “Calibration.”
2-6
Summary of Contents for 48C
Page 4: ......
Page 12: ......
Page 14: ......
Page 18: ......
Page 27: ...Chapter 3 Operation 3 3 Figure 3 2 Flowchart of Menu Driven Software ...
Page 112: ......
Page 116: ......
Page 120: ......
Page 123: ...Chapter 7 Servicing 7 3 Figure 7 2 Model 48C Component Layout 48P737 ...
Page 125: ...Chapter 7 Servicing 7 5 Figure 7 3 Optical Bench Exploded View 42P761 ...
Page 138: ......
Page 146: ...Chapter 9 Optional Equipment 9 2 Figure 9 2 Model 48C Dimensional Outline D42P725 ...
Page 155: ...Chapter 9 Optional Equipment Figure 9 8 Purge Housing Assembly 9 11 ...
Page 158: ......
Page 178: ...Appendix B RS 232 Commands B 20 µ ...
Page 184: ......
Page 186: ...C 2 ...
Page 187: ...C 3 ...
Page 188: ...C 4 ...
Page 189: ...C 5 ...
Page 190: ...C 6 ...
Page 191: ...C 7 ...
Page 192: ...C 8 ...
Page 193: ...C 9 ...
Page 194: ...C 10 ...
Page 195: ...C 11 ...
Page 196: ...C 12 ...
Page 197: ...C 13 ...
Page 198: ...C 14 ...
Page 199: ...C 15 ...
Page 200: ......
Page 201: ...APPENDIX D PUMP MAINTENANCE ...
Page 202: ......
Page 203: ......
Page 204: ......