Fault descrip-
tion
Cause
Remedy
Per-
sonnel
Position of pre-
selection lever on
the control panel
incorrect
Move pre-selection lever to "Platform"
(
Chapter 6.6 ‘Operating the machine’
Trained
people
Emergency Stop
button activated
Unlock Emergency Stop button
(
‘Emergency Stop button’ on page 29
)
Trained
people
Bracing not cor-
rect
Check bracing (
Trained
people
No or insufficient
voltage supply
Check voltage supply
Qualified
Electri-
cian
Safety equipment
has been trig-
gered (fuse, FI
circuit breaker)
Check safety equipment and switch on
or replace if necessary
(
Chapter 8.5.1 ‘Changing fuses’
Chapter 8.5.2 ‘Switching the circuit
)
Trained
people
Extension of
upper boom not
possible
Upper boom is in
the transport lock
Lift upper boom out of the transport lock
(
Chapter 6.6 ‘Operating the machine’
Trained
people
Safety equipment
has been trig-
gered (fuse, FI
circuit breaker)
Check safety equipment and switch on
or replace if necessary
(
Chapter 8.5.1 ‘Changing fuses’
Chapter 8.5.2 ‘Switching the circuit
)
Trained
people
Swivelling not
possible
Upper and lower
boom still in the
transport lock
Lift lower boom out of the transport lock
(
Chapter 6.6 ‘Operating the machine’
Trained
people
Safety equipment
has been trig-
gered (fuse, FI
circuit breaker)
Check safety equipment and switch on
or replace if necessary
(
Chapter 8.5.1 ‘Changing fuses’
Chapter 8.5.2 ‘Switching the circuit
)
Trained
people
Green light on
the control
panel is blinking
Bracing not cor-
rect
Check bracing (
Trained
people
Red light on the
control panel is
always lit
Operating lever
moved during the
start process
Activate Emergency Stop and re-start
control (unlock Emergency Stop button)
Trained
people
Faults
13.02.2013
Aerial access platform Leo15GT 2012
125
Summary of Contents for LEO 15 GT
Page 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Page 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Page 39: ......
Page 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Page 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Page 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Page 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Page 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Page 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Page 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Page 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Page 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Page 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Page 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Page 204: ......
Page 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Page 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Page 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Page 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...