8.
Insert the working basket at an angle with the
adapter (
/3).
9.
Press the working basket in the direction of the
machine and move it with the attachments
(
/2).
10. Insert the fastening bolts (
/1).
11. Secure the fastening bolts (
/2) with the
spring cotter pin (
/1).
Inserting the working basket
Fig. 76: Inserting the working
basket
Fig. 77: Inserting the fastening
bolts
Fig. 78: Securing the fastening
bolts
Operation
13.02.2013
Aerial access platform Leo15GT 2012
89
Summary of Contents for LEO 15 GT
Page 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Page 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Page 39: ......
Page 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Page 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Page 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Page 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Page 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Page 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Page 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Page 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Page 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Page 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Page 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Page 204: ......
Page 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Page 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Page 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Page 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...