4.
/1) for the chassis
adjustment in the locking bolts (
/2).
The locking lever for the chassis adjust-
ment is located behind the control box
cover.
5.
WARNING!
Danger of injury due to crushing
between crawler chassis and floor!
When operating the chassis adjustment,
there can be severe injuries due to
crushing between the crawler chassis
and the floor.
– Make sure that there are no limbs
between the crawler chassis and the
floor.
Release the locking mechanism by pressing the
locking lever (
/1) in the direction of the
arrow.
ð
The crawler chassis slips out down to the floor.
6.
/1) and remove.
7.
Carefully continue to lower the outriggers on the
side of the crawler chassis to be moved out,
meaning lift the chassis on this side, until the
crawler chassis loses contact with the floor
(
Chapter 6.5 ‘Putting the machine in work posi-
ð
The crawler chassis extends until the locking
bolt audibly latches in.
1.
the machine on/off’ on page 63).
2.
Put the machine in working position
(
Chapter 6.5 ‘Putting the machine in work posi-
Fig. 66: Locking lever
Fig. 67: Moving out crawler
chassis
Moving in the crawler chassis
Operation
13.02.2013
Aerial access platform Leo15GT 2012
85
Summary of Contents for LEO 15 GT
Page 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Page 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Page 39: ......
Page 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Page 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Page 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Page 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Page 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Page 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Page 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Page 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Page 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Page 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Page 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Page 204: ......
Page 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Page 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Page 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Page 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...