3.
Lift the machine up using the outriggers until the
crawler chassis is unloaded (
Chapter 6.5 ‘Putting the machine in
4.
Insert the locking lever (
adjustment in the locking bolts (
The locking lever for the chassis adjust-
ment is located behind the control box
cover.
WARNING!
Danger of injury due to crushing between
crawler chassis and floor!
When operating the chassis adjustment,
there can be severe injuries due to crushing
between the crawler chassis and the floor.
– Make sure that there are no limbs
between the crawler chassis and the floor.
5.
Release the locking mechanism by pressing the
/1) in the direction of the
arrow.
ð
The crawler chassis slips out down to the floor.
6.
Hold the locking lever (
tion and carefully lift the two outriggers on the
crawler chassis side (meaning lowering the chassis
on that side) in order for the crawler chassis to
Chapter 6.5 ‘Putting the machine in work
7.
Let go of the locking lever (
8.
Keep lowering the chassis until the locking bolt
audibly latches in.
Fig. 68: Unload the crawler
chassis
Fig. 69: Locking lever
Fig. 70: Moving in the crawler
chassis
Operation
13.02.2013
Aerial access platform Leo15GT 2012
86
Summary of Contents for LEO 15 GT
Page 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Page 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Page 39: ......
Page 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Page 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Page 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Page 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Page 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Page 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Page 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Page 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Page 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Page 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Page 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Page 204: ......
Page 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Page 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Page 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Page 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...