31
– On version with oilbath air cleaner, also check
air intake area „2“.
5.2.3. Check air cleaner maintenance
indicator
(optional extra)
Mechanical service indicator
32
– Increase the speed of the engine briefly to the
maximum.
If the
rubber bellows shrinks
and covers the
green area „1“, the air cleaner system should
be serviced, Chapter 5.4.2.
Under dusty conditions, check the rubber
bellows several times per day.
1
2440 / 13
5.2.4. Checking the water trap
The intervals at which you should check the
water trap depend entirely on the amount of
water in the fuel and the care taken when re-
fuelling. The normal interval is once a week.
33
– Loosen hexagon screw „1“ with approx.
3-4 rotations.
– Trap the drops which emerge in a transparent
vessel. Since water has a greater specific grav-
ity than diesel fuel, the water emerges before
the diesel fuel. The two substances separate at
a clearly visible line.
– As soon as diesel only emerges at screw „1“,
this can be tightened again.
20
Summary of Contents for LEO 15 GT
Page 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Page 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Page 39: ......
Page 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Page 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Page 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Page 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Page 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Page 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Page 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Page 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Page 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Page 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Page 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Page 204: ......
Page 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Page 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Page 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Page 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...