4.
Extend the outriggers evenly according to the
table:
Pre-selection
lever posi-
tion
Operation
Symbol
Effect
Press left control lever forwards
Outrigger 1
extends
Press right control lever forwards
Outrigger 2
extends
Press left control lever forwards
Outrigger 3
extends
Press right control lever forwards
Outrigger 4
extends
By pressing the control levers slowly, the
speed of the outriggers can be adapted.
5.
Bring the chassis in a horizontal position by
aligning the outriggers according to the circular
) (Item no. 4001/0298). The bubble
/1) of the circular level must be within the
1° circle (
ð
With proper bracing, the green light on the con-
trol panel remains lit.
Fig. 51: Circular level
Operation
13.02.2013
Aerial access platform Leo15GT 2012
74
Summary of Contents for LEO 15 GT
Page 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Page 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Page 39: ......
Page 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Page 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Page 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Page 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Page 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Page 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Page 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Page 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Page 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Page 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Page 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Page 204: ......
Page 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Page 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Page 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Page 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...