12. Use open-ended wrench to tighten mounting screw
/1).
13. Check screw connection for correct and tight fit
(tightening torque about 20 Nm).
14. Return the open-ended wrench to the document
/2).
6.10
Operate lifting device (optional)
Optionally, a lifting device (Fig. 80) can be mounted
instead of the working basket. Operation takes place via
the cable remote control. For this, an extension cable
must be connected between the plug connection of the
control console in the working basket and the cable
remote control. See also the separate operating instruc-
tions for the lifting device.
The lifting device is optional. To operate, follow the
operating instructions attached to the machine file.
6.11
Emergency operation
Personnel:
n
Trained people
Protective equipment:
n
Protective clothing
n
Safety boots
n
Protective helmet
The aerial lift platform has an emergency operation
mode which allows operation of the aerial access plat-
form even without a voltage supply.
Fig. 79: Mounting screw
working basket
Fig. 80: Lifting device
Operation
13.02.2013
Aerial access platform Leo15GT 2012
90
Summary of Contents for LEO 15 GT
Page 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Page 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Page 39: ......
Page 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Page 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Page 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Page 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Page 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Page 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Page 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Page 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Page 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Page 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Page 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Page 204: ......
Page 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Page 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Page 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Page 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...