Page
1.
Important safety notes
when operating the engine
3
2.
Description of the engine
5
3.
General notes
6
3.1.
Technical data
6
3.2.
Transport
7
3.3
Notes on installation
7
3.4.
Load on engine
7
3.5.
Type plate
7
4.
Operation
8
4.1.
Prior to first-time start-up
8
4.1.1. Engine oil
8
4.1.2. Version with oilbath air cleaner
9
4.1.3. Fuel
9
4.2.
Starting
10
4.2.1. Preparations for starting
10
4.2.2. Recoil starter
12
4.2.3. Electric starter
13
4.3.
Stopping the engine
15
5.
Maintenance
17
5.1.
Maintenance chart
17
5.2.
Maintenance every
8 – 15
operating hours
19
5.2.1. Checking engine oil level
19
5.2.2. Check air intake area for
combustion and cooling
19
5.2.3. Check air cleaner maintenance
indicator
20
5.2.4. Checking the water trap
20
Page
5.3.
Maintenance every
250
operating hours
21
5.3.1. Oilbath air cleaner maintenance
21
5.3.2. Changing engine oil
22
5.3.3. Checking and adjusting
valve clearances
23
5.3.4. Cleaning cooling air area
24
5.3.5. Checking screw connections
24
5.3.6. Cleaning the exhaust mesh inlet
25
5.4.
Maintenance every
500
operating hours
26
5.4.1. Renewing fuel filter
26
5.4.2. Air cleaner maintenance
27
5.5.
Maintenance every
1000
operating hours
29
5.5.1. Cleaning the oil filter
29
6.
Malfunctions – causes – remedies
31
7.
Work on the electrical system
35
8.
Storage out of use
35
2
Contents
This symbol identifies important safety precautions.
Please comply with these most carefully in order to avoid any risk of injury to persons or
damage to materials.
General legal requirements and safety regulations issued by the competent authorities or
industrial accident insurers must also be complied with.
Summary of Contents for LEO 15 GT
Page 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Page 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Page 39: ......
Page 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Page 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Page 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Page 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Page 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Page 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Page 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Page 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Page 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Page 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Page 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Page 204: ......
Page 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Page 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Page 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Page 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...