7.2.2
General maintenance plan
Interval
Maintenance work
Personnel
As necessary
Tension chain (
Qualified personnel
Replace filter insert (
the filter insert’ on page 117
Qualified personnel
Clean machine (
Trained people
After the first
100 hours of
operation
Tighten fastening screws on the rotating assembly
(
Chapter 7.3.8 ‘Rotating assembly tightening tor-
Qualified personnel
Every 700
hours of ope-
ration or at
least twice a
year
Tighten fastening screws on the rotating assembly
(
Chapter 7.3.8 ‘Rotating assembly tightening tor-
Qualified personnel
Weekly
Grease the grease nipple on the rotating assembly
(
Chapter 7.3.3 ‘Lubricating the rotating drive’
Qualified personnel
Grease the grease nipple on the rotary drive
(
Chapter 7.3.7 ‘Lubrication plan’ on page 118
)
Qualified personnel
Lubricate the bolts (
Qualified personnel
Check the hydraulic oil level
(
Chapter 7.3.4 ‘Checking the hydraulic oil level’
Qualified personnel
monthly
Lubricate transport guide slide bearing
(
Chapter 7.3.7 ‘Lubrication plan’ on page 118
)
Qualified personnel
Check hydraulic hoses for damage and leaks
Qualified personnel
Check energy supply chains for wear and damage
Qualified personnel
Annually
Carry out annual maintenance according to
"Check-list - Leo Maintenance -" (see Annex of
Machine Record)
Expert
Check the gearbox oil level
(
Chapter 7.3.5 ‘Check the gearbox oil level of the
Qualified personnel
Replace filter insert (
the filter insert’ on page 117
Qualified personnel
Every 6 years
Replace all hydraulic hoses
Hydraulics Spe-
cialist
Maintenance
13.02.2013
Aerial access platform Leo15GT 2012
109
Summary of Contents for LEO 15 GT
Page 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Page 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Page 39: ......
Page 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Page 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Page 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Page 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Page 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Page 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Page 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Page 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Page 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Page 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Page 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Page 204: ......
Page 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Page 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Page 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Page 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...