n
Clean chain drive after completing work.
n
If there is a danger of frost, clean the drive and track
inside by driving on clean ground. Then park the
machine on wooden boards.
8.5
Work for fault repair
8.5.1
Changing fuses
Personnel:
n
Qualified personnel
Protective equipment:
n
Protective clothing
n
Safety boots
DANGER!
Danger to life due to electric current!
In case of contact with live components, there
is danger to life. Switched-on electric compo-
nents can make uncontrolled movements and
cause extremely severe injuries.
– Before starting work, switch off the voltage
supply and secure against switching on
again.
– When changing fuses, adhere to the cor-
rect amperage.
1.
Pull the mains plug.
2.
Unscrew all knurled thumb screws (
/1) of
the cover (
/2) and remove the cover.
Fig. 118: Loosen the cover
Faults
13.02.2013
Aerial access platform Leo15GT 2012
133
Summary of Contents for LEO 15 GT
Page 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Page 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Page 39: ......
Page 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Page 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Page 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Page 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Page 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Page 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Page 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Page 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Page 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Page 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Page 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Page 204: ......
Page 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Page 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Page 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Page 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...