Running A Test
47
Press cancel to clear the error box and the system will be ready to start testing again. If the problem persists, go to
the
OPTIONS
menu and turn on the Debug Report. The system will report the measurements made in determining the
transformer configuration and where in the process the measurement failed. Send a copy of this report to Hubbell
High Voltage Test or the agent that sold the instrument. Please note on the form what the correct configuration of the
transformer is. This will allow the determination system to be refined and made more accurate.
If the system persistently fails to determine the configuration or the displacement they will have to be entered
manually from the
SETUP
screen.
8.4
Testing an Untapped Transformer
If an untapped transformer is being tests, once the connection checking process and the configuration and
determination processes have completed, the testing process continues automatically. The system will test phase A,
and if a three-phase transformer is being tested, Phase B and Phase C. As the results are taken the tables on the
screen are filled out with the data that has been gathered from the system.
Once the test has been completed, the instrument will beep three times to signal the end of the test.
Testing a Tapped Transformer Using The Front Panel
When testing a tapped transformer from the front panel, the sequence of operations is slightly different from when an
untapped transformer is being tested. Once the connection checking process, the configuration determination
process and the phase displacement determination process are completed, the system stops and produces a single
beep. This indicates that it is waiting for the first tap to be set up. Depending on the type of the transformer, this could
involve resetting the connections or the tap changer switch. While the system is waiting the user has three menu
options:
CONTINUE
This indicates that the tap is correctly set on the transformer and the instrument can
perform the measurement.
CANCEL
This abandons the measurement process part way through and discards the data
that has already been gathered. If the user selects CANCEL, the instrument asks
for confirmation before abandoning the test.
SKIP TAP
This tells the system to ignore the tap that is about to be tested and move onto the
next one. If the system is currently on the last tap, this ends the test without
discarding any of the data that has been gathered so far.
When the system is ready to test a tap, it produces a single beep. This signals that the tap can be changed onto the
next one by the user. Once the test has completed, it produces three beeps to indicate the end of test.
Summary of Contents for TTR 2795
Page 1: ...Operating Instructions HAEFELY TEST AG TTR 2795 Transformer Turns Ratio Meter Version 1 4 ...
Page 10: ...6 Introduction Maximum Roll Diameter Outer 50mm Inner 10mm ...
Page 22: ...18 Connection and Setup Figure 11 Connecting to three phase BCT ...
Page 101: ...Application Software APSW 2795 97 ...
Page 111: ...Miscellaneous 107 14 7 Conformity ...