Setting Up Tests
41
7.5
Setting Up a transformer with irregularly
spaced taps
If the transformer has irregularly spaced taps, or it has taps on the primary as well as the secondary, it is not possible
for the system to calculate the taps for itself and they have to be entered manually. It is still necessary to set the “Total
Taps” to a value > 1. This should be set to one less than the total number of ratio possibilities for the transformer. For
any transformer, if all the possible ratios are to be tested the number to be entered is:
(Number of inputs on the primary * Number of outputs on the secondary)
The “
HV Nom Voltage
” and “
LV Nom Voltage
” should be set to the nominal output (as defined by the user). This
is to allow the values to appear on the test report. The user should also set the “
Bot Tap Number
” and “
Nom Tap
Number
” so the windings are identified correctly. If the measured winding deviation is going to be measured, the “Max
Deviation” value should be set accordingly. The “Tap Setup” field must be set to “Manual”
.
After selecting the “Manual” Tap Setup (and “Total Taps” have a value > 1) then the system will display a message
box:
Pressing “
NO
” will clear the message box and the individual tap voltages will not be set respectively changed. If “
YES
”
is selected the system will display the tap setup screen:
Each tap is indicated with the tap number, the HV voltage and LV voltage. To set the voltage for a particular tap, turn
the knob until the required tap is highlighted. Clicking the knob will allow the user to enter first the HV and then the LV
voltage for that tap. Once the taps that are required to be set have been, press “
OK
” to exit from the tap setup screen.
To change already entered tap values select the “Tap Setup” field as “Manual” again and the tap voltage message
box is displayed and all tap values are accessible again.
7.6
Loading A Stored Setup For Use
To load a previously stored instrument setup from the internal memory, select the “
LOAD
” option from the menu at the
bottom of the
SETUP
screen. This will display any information stored in the memory:
Summary of Contents for TTR 2795
Page 1: ...Operating Instructions HAEFELY TEST AG TTR 2795 Transformer Turns Ratio Meter Version 1 4 ...
Page 10: ...6 Introduction Maximum Roll Diameter Outer 50mm Inner 10mm ...
Page 22: ...18 Connection and Setup Figure 11 Connecting to three phase BCT ...
Page 101: ...Application Software APSW 2795 97 ...
Page 111: ...Miscellaneous 107 14 7 Conformity ...