40
Setting Up Tests
“Nom Tap Number”
= 5
“Tap Setup”
= LV
“Step Tap to Tap”
= 0.1kV
Example 2
A transformer with 16 outputs numbered -7 to +8, each tap gives an adjustment of 5V from a 240V nominal. The
primary voltage is 1kV. The nominal tap is tap 0:
TAP
Primary
Voltage
Secondary
Voltage
-7
1kV
0.205kV
-6
1kV
0.21kV
-5
1kV
0.215kV
-4
1kV
0.25kV
-3
1kV
0.225kV
-2
1kV
0.23kV
-1
1kV
0.235kV
0 (nominal)
1kV
0.24kV
1
1kV
0.245kV
2
1kV
0.25kV
3
1kV
0.255kV
4
1kV
0.26kV
5
1kV
0.265kV
6
1kV
0.27kV
7
1kV
0.275kV
8
1kV
0.28kV
Using Tap stepping entered in percentage set:
“HV Nom Voltage”
= 1kV
“HV Nom Voltage”
= 0.24KV
“Total Taps”
= 16 (Nominal output plus 15 additional)
“Bot Tap Number”
= -7
“Nom Tap Number”
= 0
“Tap Setup”
= LV
“Step Tap to Tap”
= 2.083%
Using Tap stepping entered in voltage set:
“HV Nom Voltage”
= 1kV
“HV Nom Voltage”
= 1KV
“Total Taps”
= 16 (Nominal output plus 15 additional)
“Bot Tap Number”
= -7
“Nom Tap Number”
= 0
“Tap Setup”
= LV
“Step Tap to Tap”
= 0.005kV
Summary of Contents for TTR 2795
Page 1: ...Operating Instructions HAEFELY TEST AG TTR 2795 Transformer Turns Ratio Meter Version 1 4 ...
Page 10: ...6 Introduction Maximum Roll Diameter Outer 50mm Inner 10mm ...
Page 22: ...18 Connection and Setup Figure 11 Connecting to three phase BCT ...
Page 101: ...Application Software APSW 2795 97 ...
Page 111: ...Miscellaneous 107 14 7 Conformity ...