104
Accessories
13
Accessories
13.1
Accessories
13.2
Verification Box 2795V
The Verification Box is used to check the correct functionality of the Ratio Meter and its connected test cables.
Different ratios (1, 10, 100, 1000) can be
selected by the selector knob on top.
Test cables have to be connected following the
description on the front respectively the color
code.
The verification measurements shall be within
an overall accuracy of
±
1% of the nominal ratio.
If the displayed values exceed this limit the unit
has to be sent back to the manufacturer for
recalibration respectively repair.
Figure 12 : Verification box 2795V
13.3
External Tap Switch 2795TAP
The external tap switch cable is used for convenient tap changer testing.
After the TTR has measured a tap it stands by waiting for the operator to move the transformer tap changer to the
next tap position and continue the TTR measurement by pressing “
CONTINUE
” on the unit. The tap changer operation
box on power transformers is normally not placed at the same place where the TTR2795 is placed. The external tap
switch cable allows the operator to continue the next tap measurement from a remote position (normally at the tap
changer box of the transformer).
If the built-in indicator lamp in the knob is lit,
then the TTR is ready for the next
measurement: Move the tap changer to the next
position and press the button to start the
measurement.
The light goes off while the TTR is busy with the
measurement.
As soon as the unit is ready to measure the next
tap the built-in indicator lamp is lit again.
Figure 13 : External Tap Test Start Switch 2795TAP
Summary of Contents for TTR 2795
Page 1: ...Operating Instructions HAEFELY TEST AG TTR 2795 Transformer Turns Ratio Meter Version 1 4 ...
Page 10: ...6 Introduction Maximum Roll Diameter Outer 50mm Inner 10mm ...
Page 22: ...18 Connection and Setup Figure 11 Connecting to three phase BCT ...
Page 101: ...Application Software APSW 2795 97 ...
Page 111: ...Miscellaneous 107 14 7 Conformity ...