![Tettex TTR 2795 Operating Instructions Manual Download Page 38](http://html1.mh-extra.com/html/tettex/ttr-2795/ttr-2795_operating-instructions-manual_1092947038.webp)
34
Startup
6
Startup
6.1
Startup
After switching on the system it enters the Startup display:
Serial No.
The serial number of this instrument
FirmWare Version
The Version of the actual used firmware (system software)
Last Calibration
The date of the last factory calibration of the instrument
With the soft keys in the bottom line the single sub-menus can be entered:
SETUP
To set-up test configurations, DUT parameters etc.
TEST
To run a test
MEMORY
To access all stored data
OPTIONS
To set global system options like date, time, etc.
The Startup display is re-entered from any sub-menu by pressing the “
UP
” key until the
leftmost button indicates “
SETUP
” again.
Summary of Contents for TTR 2795
Page 1: ...Operating Instructions HAEFELY TEST AG TTR 2795 Transformer Turns Ratio Meter Version 1 4 ...
Page 10: ...6 Introduction Maximum Roll Diameter Outer 50mm Inner 10mm ...
Page 22: ...18 Connection and Setup Figure 11 Connecting to three phase BCT ...
Page 101: ...Application Software APSW 2795 97 ...
Page 111: ...Miscellaneous 107 14 7 Conformity ...