OPERATION
2-3
550E MM149 (3--91)
PREPARATION FOR OPERATION
AFTER UNLOADING AND BEFORE
OPERATING THE MACHINE:
1. Check the machine for shipping damage.
2. Read this manual carefully before operating
or servicing the machine.
FOR SAFETY: Do Not Operate Machine
Unless Operation Manual Is Read And
Understood.
3. Check the hydraulic fluid level in the
hydraulic fluid reservoir. TENNANT hydraulic
fluid is recommended. If TENNANT
hydraulic fluid is not available, use only new,
approved hydraulic oil. See
HYDRAULICS
in
the
MAINTENANCE
section.
4. Check the battery charge. Charge if needed.
See
BATTERIES
in the
MAINTENANCE
section.
5. Check the brush adjustment, as described in
BRUSHES
in the
MAINTENANCE
section.
6. Check the air pressure of the tires. See
BRAKES AND TIRES
in the
MAINTENANCE
section.
Summary of Contents for 550
Page 10: ...GENERAL INFORMATION 550E MM149 3 94 viii ...
Page 12: ...OPERATION 550E MM149 3 91 2 2 ...
Page 30: ...OPERATION 550E MM149 9 00 2 20 ...
Page 32: ...MAINTENANCE 550E MM149 3 91 3 2 ...
Page 62: ...MAINTENANCE 550E MM149 2 05 3 32 ...
Page 66: ...APPENDIX 550E MM149 3 91 4 4 ...
Page 74: ...STANDARD PARTS 550E MM149 5 01 6 4 Fig 2 Replacement Brushes 1 ...
Page 96: ...STANDARD PARTS 550E MM149 5 01 6 26 Fig 17 Electric Motor Group 1 2 3 4 5 6 ...
Page 105: ...STANDARD PARTS 6 35 550E MM149 5 01 Fig 23 Electrical Schematic 1 2 3 4 5 01228 550E ...
Page 106: ...STANDARD PARTS 550E MM149 5 01 6 36 Fig 23 Electrical Schematic 1 2 3 4 5 01228 550E ...
Page 117: ...STANDARD PARTS 6 47 550E MM149 5 01 Fig 31 Hydraulic Schematic 001330 005607 02361 550E ...
Page 118: ...STANDARD PARTS 550E MM149 5 01 6 48 Fig 32 Hydraulic Schematic 005608 11118 550E ...
Page 168: ...OPTIONS 550E MM149 9 99 8 18 ...
Page 182: ...BREAKDOWNS 550E MM149 10 10 9 14 ...