![Telestream PRISM MPI User Manual Download Page 278](http://html1.mh-extra.com/html/telestream/prism-mpi/prism-mpi_user-manual_1082248278.webp)
Application Information
Lightning Application
PRISM MPI-MPX User Manual
278
Lightning Application On-screen Tools
You can change the horizontal gain, vertical gain, horizontal position, vertical position,
and bar targets without opening up the Vector Settings menu through on-screen tools.
Select the tool/button for the setting you want to adjust. All the available tools are
located on the top and bottom of the display and are highlighted for a few seconds
when the application is first opened or if you select anywhere in the middle of the
application tile.
Horizontal and Vertical Gain
Increase or decrease the magnification of the horizontal and vertical trace displays.
1.
Select the button to in the top left corner to expand the available options drop
down list.
2.
Select one of the preset magnifications for fixed horizontal and vertical gain using
the H Gain and V Gain options.
Summary of Contents for PRISM MPI
Page 1: ...PRISM MPI and MPX SDI IP Waveform Monitor User Manual April 2021 D00010020C...
Page 6: ...6 PRISM MPI MPX User Manual...
Page 10: ...10 PRISM MPI2 25 MPX2 25 User Manual...
Page 54: ...Getting Started Activity Center PRISM MPI MPX User Manual 54...
Page 76: ...Methods of Operation Remote Control through API Commands PRISM MPI MPX User Manual 76...
Page 138: ...Configure the Instrument Troubleshooting PRISM MPI MPX User Manual 138...