G10 Installation Guide 7.13.2
163
C
Rev. 005-140228
Note that some new AC power units do not have an on/off switch.
Figure C.55 - DC Power Switch on Disk Array
5.
Reconnect the cables.
6.
Power on the probe. See the probe start up procedure for details on powering
up the probe.
7.
Check that the FRU OK LED (back) is green, indicating that the controller has
completed initializing, is online, and is operating normally.
8.
See the
Iris Installation and Upgrade Guide
to configure the G10 Probe and
complete the disk array replacement. Contact Tektronix Communications
Customer Support for assistance.
Tektronix Communications | For Licensed Users | Unauthorized Duplication and Distribution Prohibited