116
Netra X4200 M2 Server Service Manual • May 2007
■
NET MGT
■
SER MGT
■
TTYA
■
PCI-E 0
■
Alarm
■
PCI-X 2
■
PCI-X 1
■
PCI-X 0
■
Power supply 1
■
Power supply 0
2. If necessary, reinstall the appropriate cables into the CMA.
3. Power on the server.
See
“Powering On the Server” on page 116
.
Powering On the Server
As soon as the power cords are connected, standby power is applied, and depending
on the configuration of the firmware, the system might boot. If not, follow this
procedure.
●
Use one of these steps to power on the server:
Summary of Contents for Netra X4200 M2
Page 10: ...x Netra X4200 M2 Server Service Manual May 2007...
Page 14: ...xiv Netra X4200 M2 Server Service Manual May 2007...
Page 24: ...10 Netra X4200 M2 Server Service Manual May 2007...
Page 46: ...32 Netra X4200 M2 Server Service Manual May 2007 Sun ESD mat part number 250 1088...
Page 133: ...Chapter 3 Maintaining the Netra X4200 M2 Server 119...
Page 134: ...120 Netra X4200 M2 Server Service Manual May 2007...
Page 146: ...130 Netra X4200 M2 Server Service Manual May 2007...
Page 154: ...138 Netra X4200 M2 Server Service Manual May 2007...
Page 172: ...156 Netra X4200 M2 Server Service Manual May 2007...