5. The chassis rail assembly is now ready to be installed in the cabinet.
Figure 7–3 Chassis Rail Assembly
RAIL
BRACKET
CHASSIS
RAIL
SCREW, 10-32
FH
(4 PLACES)
CXO-3934A-MC
ROUND
STANDOFF
UP
NUT BAR,
UNBEVELED
ROUND
STANDOFF
NUT BAR,
BEVELED
(2 PLACES)
U-NUT, 10-32
(2 PLACES)
7.3.2 Right Position Chassis Rail Assembly Installation
Install the chassis rail assembly in the right position within the cabinet as follows
(see Figure 7–4):
WARNING
Cabinet rail edges may be sharp and can slice or abrade skin or cable
insulation.
1. Turn the cabinet power off as described in Section 7.1.
2. Determine the correct tape drive mounting locations and corresponding
cabinet rail mounting holes for the chassis rail assembly. Refer to the chapter
in this document pertaining to your specific cabinet configuration for this
information. The tape mounting hole specified for each position is the chassis
rail locating hole shown in Figure 7–4.
Installing TZLX-Series Tape Drives 7–5