PROFIBUS DP Communication
8.6 DP slave MCP 310
Manual
254
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
Note
The PLC basic program must be installed on the computer on which SIMATIC STEP 7 is
installed. To install the basic PLC program, please pay attention to the corresponding
instructions in the file:
•
< Installation path>\importantinfo.rtf
References:
The following manuals are required for the commissioning of the MCP:
/FB1/ Function Manual - Basic Functions, P3 PLC Basic Program, Program Structure and
the Modules of the PLC Basic Program
/FB2/ Function Manual - Extension Functions, H1 Manual and Handwheel Travel, Startup of
Handwheels
/BH/ Operator Components Manual - Description of MCP 310 (interfaces, electrical
connection etc.)
/Z/ Catalog NCZ, Connection components: Cables, connectors, etc.
Automation system
To commission the MCP, the automation system must be fully connected mechanically as
well as electrically, with reference to NC, PLC and MCP.
The drives must be secured against accidental moving.