PLC commissioning
6.3 Creating a SIMATIC S7 project
Manual
166
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
Data transfer rate: 12 Mbps
Profile: DP
Button: "Options..."
Dialog: Options
Tab Equidistant
Active equidistant bus cycle: ☑
Equidistant DP cycle:
<Equidistant time>
OK
OK
OK
Note
S7-Subnetz-ID (S7 subnet ID)
It is recommended to note the S7-Subnetz-ID (S7 subnet ID) , because it will be needed later
for parameterization of the routing settings:
•
SINAMICS: See Section Create new project without Project Wizard (Page 310)
•
SIMODRIVE: See Section Setting the routing information (Page 351)