General Information on the SINUMERIK 840Di sl
1.3 Notes on startup
Manual
Commissioning Manual, 05/2008, 6FC5397–4CP10–4BA0
35
Additional hardware
The following hardware components are required for commissioning:
●
Via the Ethernet interface, e.g. PG740:
–
Creation of the SIMATIC S7 project for commissioning of the PLC, as well as the
PROFIBUS communication
–
Installation of additional software on the PCU
For installing the software on the PCU see Section "License management" (Page 146).
●
Communications link: PG/PC with NC, PLC and drives
–
Ethernet cable
Note
No programming device is required in the following cases:
•
SIMATIC Manager STEP7 is installed on the SINUMERIK 840Di sl PCU
•
A PG/PC is needed for installing additional software
For installing the software on the PCU see Section "License
Documentation
The following documentation is required for commissioning:
●
/BH/ Operator Components Manual
–
Operator panel fronts
–
PCU 50.3
–
Machine control panels
–
Operator panel, handheld terminal HT8
Depending on the NC and PLC functions used, the corresponding function manuals are
needed:
●
/FB/ Function Manual - Basic Functions
●
/FB/ Function Manual - Extended Functions
●
/FB/ Function Manual - Special Functions
●
/LIS/ Lists
–
Overview of functions
–
Machine, Setting Data and Variables
–
Interface Signals and PLC Blocks.
●
/DA/ Diagnostics Manual:
–
Interrupts