7 | Installation
60/174
8DJH • Installation and Operating Instructions • Version 11 • 500-8384.9
Installation with pressure relief duct and base supplied separately:
1.
Panels in free-standing arrangement or metering panels:
Bolt the two parts of the
pressure relief duct together using 8 self-tapping bolts M6.
2.
Panels in wall-standing arrangement (except metering panels):
Do not yet install the top
unit of the pressure relief duct.
3. Bolt the pressure relief duct together with the fixing brackets on both sides of the base using
6 self-tapping bolts M6 each.
Panels in wall-standing arrangement (except meter-
ing panels):
Metering panels or panels in free-standing
arrangement:
2x6
2x6
8x
4. Install the bases of all panels and line them up.
5. Bolt the bases together using 2 bolts and nuts M8 each.
Fig. 39:
Bolting the bases together (example)
Summary of Contents for 8DJH
Page 173: ......