Installation | 7
81/174
500-8384.9 • Version 11 • Installation and Operating Instructions • 8DJH
3. If available, bolt the bases for the pressure absorber system together ( [
the base and the pressure relief duct for the pressure absorber system (IAC up to 21 kA)"]).
4. If available, bolt the low-voltage compartments of the panels together [
"Installing the low-voltage compartment"].
5. Bolt the lined up panel to the foundation [
Page 55, "Preparing the switchgear room"].
6. Interconnect the earthing busbars of the panels [
Page 86, "Interconnecting the earthing
busbars"].
7. Hook the removed cable compartment covers in [
Page 125, "Removing and mounting the
8. Interconnect all other panels in the same way.
7.16 Mounting the busbar termination
On free busbar ends, screened silicone dummy plugs are inserted, each of which is pressed on
through a clamping cover for dummy plugs. A busbar termination cover is fastened over all three
dummy plugs.
Fig. 85:
Principle of installation for busbar termination
1
Side wall of vessel
2
Silicone dummy plug
3
Clamping cover for dummy
plugs
4
Busbar termination cover
Preparing installation
NOTICE
Reusing components
Reused components may be damaged and can damage the switchgear during operation.
⇨ Use only new original components.
NOTICE
Damage to the busbar bushes
Removing the protective caps with pointed or sharp-edged objects can damage the busbar
bushes and cause an internal arc during operation.
⇨ Do not remove the protective caps using pointed or sharp-edges objects.
Protective caps are mounted on the busbar bushes at the factory as transport protection.
Do not
use the protective caps as surge-proof caps.
Summary of Contents for 8DJH
Page 173: ......