9 | Operation
162/174
8DJH • Installation and Operating Instructions • Version 11 • 500-8384.9
7. Fit new HV HRC fuse-link into the contact springs and observe the striker position. The arrow
on the HV HRC fuse-link must point towards the box cover.
8. Verify correct seating of the covers and the HV HRC fuse-link.
9. Push the fuse slide into the guide slot of the fuse box.
10. Push the fuse slide into the fuse box as far as it will go. The fuse slide cover must rest fully on
the cast-resin frame of the fuse box.
11. Push the handle of the fuse slide down until it latches tight.
12. The cable compartment cover can only be hooked in correctly if the fuse slides are properly
latched in.
13. Hook the cable compartment cover in [
Summary of Contents for 8DJH
Page 173: ......