Technical data | 4
31/174
500-8384.9 • Version 11 • Installation and Operating Instructions • 8DJH
Operating times, contacts
The time indications in the following table refer to the application of the switchgear in
accordance with IEC 60721-3-3 Class 3K4. If the switchgear is operated beyond this range, the
indicated times may deviate.
Tab. 24:
Operating times
Designation
Component (item designation)
Unit
Time
Type 1.1
Type 2
Closing time
Closing solenoid
(-Y9)
ms
< 75
< 30
Opening time
1st shunt release
(-Y1)
ms
< 65
< 35
Additional release
2nd shunt release
(-Y2)
ms
< 50
—
(-Y3)
ms
—
< 35
C.t.-operated release
(-Y4)
ms
< 50
—
(-Y6)
ms
--
< 35
Undervoltage release
(-Y7)
ms
< 50
< 35
Low-energy release
(-Y6)
ms
—
< 35
Arcing time
ms
< 15
< 15
Break time
1st shunt release
(-Y1)
ms
< 80
< 50
Additional release
2nd shunt release
(-Y2)
ms
< 65
—
(-Y3)
ms
—
< 50
C.t.-operated release
(-Y4)
ms
< 65
--
(-Y6)
ms
—
< 50
Undervoltage release
(-Y7)
ms
< 65
< 50
Low-energy release
(-Y6)
ms
—
< 50
Charging time (motor)
s
< 15
< 15
Dead time
s
0.3
180
Close-open contact time
1st shunt release
(-Y1)
ms
< 80
< 65
Additional release
2nd shunt release
(-Y2)
ms
< 60
—
(-Y3)
ms
—
< 65
C.t.-operated release
(-Y4)
ms
< 60
—
(-Y6)
ms
—
< 65
Undervoltage release
(-Y7)
ms
< 60
< 65
Low-energy release
(-Y6)
ms
—
< 65
Minimum command duration
1)
CLOSE
Closing solenoid
(-Y9)
ms
45
40
OPEN
1st shunt release
(-Y1)
ms
< 40
< 40
Additional release
2nd shunt release
(-Y2)
ms
< 20
--
(-Y3)
ms
--
< 40
C.t.-operated release
(-Y4)
ms
< 20
--
(-Y6)
ms
--
< 20
Undervoltage release
(-Y7)
ms
< 20
< 20
Low-energy release
(-Y6)
ms
--
< 20
1)
For operation of the switchgear beyond the range defined by IEC 60721-3-3 Class 3K4, a minimum command duration of 100 ms is
recommended.
Closing time:
The interval of time between the initiation (command) of the closing operation
and the instant when the contacts touch in all poles.
Opening time:
The interval of time between the initiation (command) of the opening operation
and the instant when the contacts separate in all poles.
Arcing time:
The interval of time from the first initiation of an arc and the instant of final arc
extinction in all poles.
Break time:
The interval of time between the initiation (command) of the opening operation
and the instant of final arc extinction in the last-pole-to-clear (= opening time and arcing time).
Close-open contact time:
The interval of time - in a make-break operating cycle - between the
instant when the contacts touch in the first pole in the closing process, and the instant when the
contacts separate in all poles in the subsequent opening process.
Summary of Contents for 8DJH
Page 173: ......