Chapter 6) 7SR23 DAD Commissioning & Maintenance Guide
©2013 Siemens Protection Devices Limited
Chapter 6 Page 17 of 26
It is also desirable to check the operating voltage achieved with the setting resistor and all parallel CTs connected
but de-energised. A higher capacity test set will be required for this test. Adequate current must be supplied to
provide the magnetising current of all connected CTs. Precautions should be taken to ensure that no personnel
are at risk of contact with any of the energised secondary wiring during the test.
Settings Data:
Voltage Setting (V
S
)
V
S
Measured
Settings Data:
Operate Current (I
OP
)
I
OP
Measured
87REF-1
87REF-2
To complete testing of the REF requires primary injection through the phase and residual (REF) CT in series to
simulate an out of zone fault and ensure stability of the relay. The test can then be repeated with the REF CT
secondary connections reversed to prove operation.
2.3.1.1 Element Blocking
The Restricted Earth Fault element can be blocked by Binary Input Inhibit. Where applied this functionality should
be checked.
Element
BI Inhibits
Checked
87REF-1
87REF-2
Check correct indication, trip output, alarm contacts, waveform record.
Check that any shorting links are removed after testing.
Summary of Contents for 7SR23 DAD
Page 1: ...Answers for energy 7SR23 DAD High Impedance Protection Relay Reyrolle Protection Devices ...
Page 2: ......
Page 4: ...7SR23 DAD Contents 2013 Siemens Protection Devices Limited ...
Page 60: ...Chapter 3 7SR23 DAD Performance Specification 2013 Siemens Protection Devices Limited ...
Page 225: ......