5
ELECTRICAL INSTALLATION
38
8022161-1B29 / V2-0/2021-04|SICK
T R A N S L A T I O N O F A N O R I G I N A L O P E R A T I N G I N S T R U C T I O N S | Backup Assistance System
Subject to change without notice
5.1
Connection overview
Fig. 36: Connection overview
Make connections in the following order:
▸
Connect the 2D-LiDAR sensor(s) to the control unit using the 5 m cable included with
delivery.
▸
Connect the signal light bar(s) to the control unit using the 5 m cable included with
delivery.
▸
Connect the control unit to the fuse panel or to the control cabinet of the vehicle.
The connection is made via the two 3 m-long cables leading out of the control unit
housing.
The components are always connected starting from the control unit:
▸
Then pull the cables to the component to be connected.
Connections
to be made
Notes on routing
the cables