
- 69 -
7.5.2 Output Parameter Setting Group
In Output parameter setting group, the following can be set:
OUT1 proportional cycle, OUT1 ON/OFF hysteresis, OUT2 proportional cycle (DR, DS or DA
option), OUT2 cooling method (DR, DS or DA option), Direct/Reverse action, etc.
Setting items in the Output parameter setting group are shown below.
Character,
Factory Default
Setting Item, Function, Setting Range
• Relay contact
output: 30 sec
• Non-contact
voltage output:
3 sec
OUT1 proportional cycle
• Sets OUT1 proportional cycle.
• Setting range:
1 to 120 sec
Available when control output OUT1 is Relay contact output or Non-contact voltage
output.
OUT1 ON/OFF hysteresis
• Sets OUT1 ON/OFF hysteresis.
(Fig. 7.5.2-1)
• Setting range:
Thermocouple, RTD input: 0.1 to 1000.0
( )
DC voltage, current input: 1 to 10000
(The placement of the decimal point follows
the selection.)
•
DR: 30 sec
•
DS: 3 sec
OUT2 proportional cycle
• Sets OUT2 proportional cycle.
• Setting range:
1 to 120 sec
Available when Heating/Cooling control (DR or DS option) is ordered.
OUT2 cooling method
• Selects OUT2 cooling method.
(Fig. 7.5.2-2)
ON
OFF
SV
OUT1
hysteresis
Hysteresis
OUT2 proportional band
SV
Air cooling
Oil cooling
Water cooling