
95
Unit Operation Checks
9. PCB ASSY, IG CTRL-A
Outline
IG CTRL-A lights the ion-gauge measurement bulb (IG bulb) filament and generates the grid
voltages. The MAIN CTRL-A PCB offers the functions to measure the collector current to
determine the degree of vacuum. When the filament lights, thermoelectrons are
discharged toward a grid held at a potential of +150V, resulting in a current from the grid to
the filament (grid current). As the filament is lit by a power supply with a floating potential,
the grid current flows toward earth potential in the IG CTRL-A circuit. This circuit adjusts
the current flowing through the filament to maintain a 1mA grid current flow to earth potential.
The grid current flows through a Zener diode, which increases the filament potential above
earth potential by the amount (Zener v voltage drop in the current detector
resistance), giving a potential of +25V at a 1mA grid current. The degree of vacuum is
determined from the amount of positive ions captured at the earth-potential collector
electrode.
Operation Check Method
If an abnormality occurs, follow the procedures below to check the operation of the IG
CTRL-A PCB to efficiently diagnose the problem.
In case of abnormal degree of vacuum measured values, see the item
Checking the
ion-gauge vacuum measurement circuit
for the MAIN CTRL-A PCB (page 62).
Caution
A voltage over +150VDC is supplied to the PCB. To avoid electric shocks or damage
to the assembly, touch only the points instructed.
1. Checking the installation
One of the four screws locating the IG CTRL-A PCB acts to earth the PCB to the chassis.
Current flows may be interrupted if this screw is loose. Be sure to correctly tighten these
screws.
Check there is no looseness in the connector socket contacts where the IG bulb pins are
inserted.
Summary of Contents for GCMS-QP2010 Series
Page 1: ...1 225 00612A Gas Chromatograph Mass Spectrometer GCMS QP2010 Service Manual...
Page 27: ...27...
Page 71: ...71 Wiring Diagrams 1 Wiring diagram Overall Wiring Diagrams...
Page 72: ...72 Wiring Diagrams 2 Wiring diagram MAIN POWER ASSY...
Page 73: ...73 Unit Operation Checks 3 Wiring diagram Details...
Page 76: ...76 MAIN POWER ASSY Block Diagram Parts inside the broken box are in the MAIN POWER ASSY...
Page 79: ...79 DC POWER A Block Diagram...
Page 84: ...84 MAIN CTRL A Block Diagram...
Page 85: ...85...
Page 90: ...90 IS CTRL A Block Diagram...
Page 94: ...94 HV PCB ASSY block diagram 1 UNNCI case of model EI CI 2 NCI case of model NCI...
Page 98: ...98 IG CTRL A PCB Block Diagram...
Page 109: ...109 DI CTRL A block diagram...
Page 150: ...126 Do not remove the 2 screws on the right side Remove the 2 screws on the left side...
Page 151: ...127 Remove cardboard Move the TW300 left by holding in both hands...
Page 155: ...131 Remove the cap of outlet Loosen the 3 fixing screws and remove the plate Remove the o ring...
Page 160: ...136 Remove the cardboard Completion of TMP mounting...
Page 161: ...137 12 Fix the flange to outlet Place the flange on the outlet Do not forget to place o ring...
Page 163: ...139 Slide fast the IS CTRL A board down and fix it 4 screws Connect the two connectors...
Page 164: ...140 14 Place the covers Place the front cover Place the front door...