
110
Unit Operation Checks
13. RELAY BOX-A
Outline
On/off of rotary pump 2 (RP2) that uses it with DI option in RELAY BOX-A is conducted.
The relay point of contact signal is sent to the RP2 CTRL connector of the device back.
On/off of RP2 is controlled in accordance with the on/off.
Action confirmation method
There be some abnormality and malfunction rationally, when I do it with the following
procedure in the case that the action of RELAY BOX-A is confirmed and the normal
judgment is possible.
CAUTION
!
The voltage of the inside becomes AC100
〜
240V.
Please pay attention sufficient when the inside is confirmed due to the damage
prevention of electric shock prevention, measurement devices.
1.
Confirmation of power supply voltage
Whether the power supply voltage that is using it, with the power supply voltage that is
written to RELAY BOX epitaph board be agreeing is confirmed.
2
.
Confirmation of RP2 CTRL
Please turn on RP2.
Please confirm that 2 pin of the RP2 CTRL connectors of the for device back are connected.
Please turn off RP2. Please confirm that 2 pin of the RP2 CTRL connectors of the device
back for, are not connected.
Power supply voltage is out, to the cable of RP2 CTRL that is growing from RELAY BOX.
Please quit because it invites the accident such as an electric shock to draw a terminal and
confirm an action.
3
.
Confirmation of no fuse breaker
No fuse breaker is attached for overcurrent protection.
In the case that the no fuse breaker is acting there are possibility such as the accident of
the faulty or inside wiring of a rotary pump. Please cause to return a no fuse breaker, after
Summary of Contents for GCMS-QP2010 Series
Page 1: ...1 225 00612A Gas Chromatograph Mass Spectrometer GCMS QP2010 Service Manual...
Page 27: ...27...
Page 71: ...71 Wiring Diagrams 1 Wiring diagram Overall Wiring Diagrams...
Page 72: ...72 Wiring Diagrams 2 Wiring diagram MAIN POWER ASSY...
Page 73: ...73 Unit Operation Checks 3 Wiring diagram Details...
Page 76: ...76 MAIN POWER ASSY Block Diagram Parts inside the broken box are in the MAIN POWER ASSY...
Page 79: ...79 DC POWER A Block Diagram...
Page 84: ...84 MAIN CTRL A Block Diagram...
Page 85: ...85...
Page 90: ...90 IS CTRL A Block Diagram...
Page 94: ...94 HV PCB ASSY block diagram 1 UNNCI case of model EI CI 2 NCI case of model NCI...
Page 98: ...98 IG CTRL A PCB Block Diagram...
Page 109: ...109 DI CTRL A block diagram...
Page 150: ...126 Do not remove the 2 screws on the right side Remove the 2 screws on the left side...
Page 151: ...127 Remove cardboard Move the TW300 left by holding in both hands...
Page 155: ...131 Remove the cap of outlet Loosen the 3 fixing screws and remove the plate Remove the o ring...
Page 160: ...136 Remove the cardboard Completion of TMP mounting...
Page 161: ...137 12 Fix the flange to outlet Place the flange on the outlet Do not forget to place o ring...
Page 163: ...139 Slide fast the IS CTRL A board down and fix it 4 screws Connect the two connectors...
Page 164: ...140 14 Place the covers Place the front cover Place the front door...