
ZEAV-0416A
Shimadzu Corporation
2010 Installation Completion Checklist
The items relate to acquiring installation completion data and conducting operation checks.
Installation is complete when all items in the installation completion checklist have been checked and
the operation instruction completed. (A standard installation requires four working days.)
Analysis of the customer's samples is
separate from the installation process
.
Checklist
No.
Check Item
Check Details and Conditions
Criteria
Check
Comment
1
Installation
conditions
Power supply:120/ 220/230/240V
Check supply capacity (see System User
Guide)
Grounding (100
Ω
max.)
Location
:
Space designated in System User Guide
available?
Check strength of table (able to support
100kg?)
Temperature:
Check ambient conditions at installed
location.
Gas (Helium purity and pressure regulator)
He purity
Designated pressure and contamination
check
Exhaust:
Is RP exhaust outlet connected to exhaust
outside the building or is an oil-mist filter
used?
within
±
5%
Greater than indicated value.
Grounded
Available
No flexing or vibrations
within 23
±
5
M
C
99.995% min.
No abnormality in analysis
data
Yes
□
□
□
□
□
□
□
□
□
( V)
( A)
2
Operation checks
a. Basic operation
b. Explanation
* Do the RP/TMP start normally with the
GCMSsolution startup program? (Automatic
start completes within 5 minutes?)
* Normal communication with GC using the
GCMSsolution GC parameters?
* Temperature control of INJ, OVEN, I/F units?
* Explain MS, MC, and SIM measurement using
OFN 100pg/
µ
L standard sample (tuning,
creating methods, analysis, batch processing,
data re-analysis, outputting reports).
Normal
Normal
READY lamp does not go
out
Operation explained
□
□
□
□
3
Function checks
a. Tuning
* Peak intensity fluctuates when each lens
voltage is changed in the tuning window.
* Detector voltage stabilizes at -1.8kV or below
after auto-tuning? (This checks the ion-source
operation, SI sample injected volume, and
detector performance.)
* Discrepancy in peak amplitudes within 0.1M
after auto-tuning?
* When pattern correction is selected
m/z502 intensity over 2% of m/z69 intensity?
Keep auto-tuning data.
Fluctuates
-1.8kV or below
Within 0.1M
Over 2%
□
□
□
□
Summary of Contents for GCMS-QP2010 Series
Page 1: ...1 225 00612A Gas Chromatograph Mass Spectrometer GCMS QP2010 Service Manual...
Page 27: ...27...
Page 71: ...71 Wiring Diagrams 1 Wiring diagram Overall Wiring Diagrams...
Page 72: ...72 Wiring Diagrams 2 Wiring diagram MAIN POWER ASSY...
Page 73: ...73 Unit Operation Checks 3 Wiring diagram Details...
Page 76: ...76 MAIN POWER ASSY Block Diagram Parts inside the broken box are in the MAIN POWER ASSY...
Page 79: ...79 DC POWER A Block Diagram...
Page 84: ...84 MAIN CTRL A Block Diagram...
Page 85: ...85...
Page 90: ...90 IS CTRL A Block Diagram...
Page 94: ...94 HV PCB ASSY block diagram 1 UNNCI case of model EI CI 2 NCI case of model NCI...
Page 98: ...98 IG CTRL A PCB Block Diagram...
Page 109: ...109 DI CTRL A block diagram...
Page 150: ...126 Do not remove the 2 screws on the right side Remove the 2 screws on the left side...
Page 151: ...127 Remove cardboard Move the TW300 left by holding in both hands...
Page 155: ...131 Remove the cap of outlet Loosen the 3 fixing screws and remove the plate Remove the o ring...
Page 160: ...136 Remove the cardboard Completion of TMP mounting...
Page 161: ...137 12 Fix the flange to outlet Place the flange on the outlet Do not forget to place o ring...
Page 163: ...139 Slide fast the IS CTRL A board down and fix it 4 screws Connect the two connectors...
Page 164: ...140 14 Place the covers Place the front cover Place the front door...