
62
Problems when starting evacuation
6. Pirani gauge, IC value too high, IG does not light
Check the column flow rate.
□
Is the column flow rate within the recommended range?
At a column flow rate of approximately 2mL/minute, the Pirani gauge value is about
40Pa or lower at the start of evacuation and about 1 to 10Pa after one day.
The normal IG gauge value after one day is no more than 1 to 2E
-3
Pa.
(See Appendix E in the System User Guide.)
Check the N
2
(m/z28) and O
2
(m/z32) values.
□
If these values are larger than the m/z18 value
Check for looseness in the column connector and for damage to the input septum or
column.
Check the carrier gas piping.
Thoroughly purge the piping when GC/MS has been newly installed.
(After purging at the GC connector for several minutes, turn on the GC power, set the
purge flow and total flow to maximum, and leave for 10 or 20 minutes.)
Follow the vacuum-leak check procedures in the System User Guide to identify
vacuum leak positions.
Check IG.
□
Is the IG filament burned out?
An error is displayed if the IG filament is burned out.
□
Is the connector wired correctly?
Refer to sections
4.6 PCB Assy, MAIN CTRL-A
and
4.9 PCB Assy, IC CTRL-A
when
checking the IG control.
Summary of Contents for GCMS-QP2010 Series
Page 1: ...1 225 00612A Gas Chromatograph Mass Spectrometer GCMS QP2010 Service Manual...
Page 27: ...27...
Page 71: ...71 Wiring Diagrams 1 Wiring diagram Overall Wiring Diagrams...
Page 72: ...72 Wiring Diagrams 2 Wiring diagram MAIN POWER ASSY...
Page 73: ...73 Unit Operation Checks 3 Wiring diagram Details...
Page 76: ...76 MAIN POWER ASSY Block Diagram Parts inside the broken box are in the MAIN POWER ASSY...
Page 79: ...79 DC POWER A Block Diagram...
Page 84: ...84 MAIN CTRL A Block Diagram...
Page 85: ...85...
Page 90: ...90 IS CTRL A Block Diagram...
Page 94: ...94 HV PCB ASSY block diagram 1 UNNCI case of model EI CI 2 NCI case of model NCI...
Page 98: ...98 IG CTRL A PCB Block Diagram...
Page 109: ...109 DI CTRL A block diagram...
Page 150: ...126 Do not remove the 2 screws on the right side Remove the 2 screws on the left side...
Page 151: ...127 Remove cardboard Move the TW300 left by holding in both hands...
Page 155: ...131 Remove the cap of outlet Loosen the 3 fixing screws and remove the plate Remove the o ring...
Page 160: ...136 Remove the cardboard Completion of TMP mounting...
Page 161: ...137 12 Fix the flange to outlet Place the flange on the outlet Do not forget to place o ring...
Page 163: ...139 Slide fast the IS CTRL A board down and fix it 4 screws Connect the two connectors...
Page 164: ...140 14 Place the covers Place the front cover Place the front door...