
32
Description of Parts
5. Valves
VALVE Assy
225-10179-91
Capillary Assy
225-015559-91
Glass sample pin
225-04257-91
O-ring
036-11202
SI Assy
225-10180-91
Standard Sample Inlet Unit
Leak Valve
Leak valve Assy
Bolt SUS with hole M3X6
LEAK VALVE ASSY
225-10116-91
BRACKET,LEAK VALVE
225-10118
BOLT SUS WITH HOLE
M3X6
022-27602
Summary of Contents for GCMS-QP2010 Series
Page 1: ...1 225 00612A Gas Chromatograph Mass Spectrometer GCMS QP2010 Service Manual...
Page 27: ...27...
Page 71: ...71 Wiring Diagrams 1 Wiring diagram Overall Wiring Diagrams...
Page 72: ...72 Wiring Diagrams 2 Wiring diagram MAIN POWER ASSY...
Page 73: ...73 Unit Operation Checks 3 Wiring diagram Details...
Page 76: ...76 MAIN POWER ASSY Block Diagram Parts inside the broken box are in the MAIN POWER ASSY...
Page 79: ...79 DC POWER A Block Diagram...
Page 84: ...84 MAIN CTRL A Block Diagram...
Page 85: ...85...
Page 90: ...90 IS CTRL A Block Diagram...
Page 94: ...94 HV PCB ASSY block diagram 1 UNNCI case of model EI CI 2 NCI case of model NCI...
Page 98: ...98 IG CTRL A PCB Block Diagram...
Page 109: ...109 DI CTRL A block diagram...
Page 150: ...126 Do not remove the 2 screws on the right side Remove the 2 screws on the left side...
Page 151: ...127 Remove cardboard Move the TW300 left by holding in both hands...
Page 155: ...131 Remove the cap of outlet Loosen the 3 fixing screws and remove the plate Remove the o ring...
Page 160: ...136 Remove the cardboard Completion of TMP mounting...
Page 161: ...137 12 Fix the flange to outlet Place the flange on the outlet Do not forget to place o ring...
Page 163: ...139 Slide fast the IS CTRL A board down and fix it 4 screws Connect the two connectors...
Page 164: ...140 14 Place the covers Place the front cover Place the front door...