
3
Contents
CONTENTS................................................................................................................................... 3
1. INSTALLATION......................................................................................................................... 5
1. Checking Installation Conditions ................................................................................... 6
2. Unpacking, Assembly, Installation ................................................................................. 8
3. Environment Settings, Start-up.................................................................................... 11
4. Leak Check, Auto-tuning ............................................................................................. 13
5. Auto-tuning .................................................................................................................. 15
6. Qualitative Analysis (SCAN Mode) .............................................................................. 16
7. Quantitative Analysis (SIM Mode) ............................................................................... 18
8. S/N Measurements...................................................................................................... 19
9. Batch Processing, Report Printing, QA/QC ................................................................. 20
10. Maintenance.............................................................................................................. 21
11. S/N Measurements
CI
MODE
(
OPTION
)
.......................................................... 22
12.S/N Measurements
NCI
MODE
(
OPTION
)
........................................................ 23
13.Mass patern check Measurements
DI
MODE
(
OPTION
)
.................................. 24
2. MAINTENANCE ...................................................................................................................... 25
1. MS Navigator .............................................................................................................. 26
2. Instrument Configuration ............................................................................................. 28
3. Lens Unit ..................................................................................................................... 29
4. Interface Unit............................................................................................................... 31
5. Valves.......................................................................................................................... 32
6. MS Filter Unit ..............................................................................................................33
7. Detector Unit ...............................................................................................................35
8. Turbo Molecular Pump ................................................................................................ 36
9. Main Power Unit.......................................................................................................... 37
10. GC Unit ..................................................................................................................... 38
11. Updating the Flash ROM ........................................................................................... 39
12. Backing Up and Restoring the E2PROM................................................................... 42
13. Adjusting the RF PS Assy.......................................................................................... 47
3. TROUBLESHOOTING............................................................................................................ 53
1. MS does not turn on.................................................................................................... 54
2. Abnormal Status LEDs ................................................................................................ 55
3. Cannot connect to MS................................................................................................. 56
Summary of Contents for GCMS-QP2010 Series
Page 1: ...1 225 00612A Gas Chromatograph Mass Spectrometer GCMS QP2010 Service Manual...
Page 27: ...27...
Page 71: ...71 Wiring Diagrams 1 Wiring diagram Overall Wiring Diagrams...
Page 72: ...72 Wiring Diagrams 2 Wiring diagram MAIN POWER ASSY...
Page 73: ...73 Unit Operation Checks 3 Wiring diagram Details...
Page 76: ...76 MAIN POWER ASSY Block Diagram Parts inside the broken box are in the MAIN POWER ASSY...
Page 79: ...79 DC POWER A Block Diagram...
Page 84: ...84 MAIN CTRL A Block Diagram...
Page 85: ...85...
Page 90: ...90 IS CTRL A Block Diagram...
Page 94: ...94 HV PCB ASSY block diagram 1 UNNCI case of model EI CI 2 NCI case of model NCI...
Page 98: ...98 IG CTRL A PCB Block Diagram...
Page 109: ...109 DI CTRL A block diagram...
Page 150: ...126 Do not remove the 2 screws on the right side Remove the 2 screws on the left side...
Page 151: ...127 Remove cardboard Move the TW300 left by holding in both hands...
Page 155: ...131 Remove the cap of outlet Loosen the 3 fixing screws and remove the plate Remove the o ring...
Page 160: ...136 Remove the cardboard Completion of TMP mounting...
Page 161: ...137 12 Fix the flange to outlet Place the flange on the outlet Do not forget to place o ring...
Page 163: ...139 Slide fast the IS CTRL A board down and fix it 4 screws Connect the two connectors...
Page 164: ...140 14 Place the covers Place the front cover Place the front door...