Chapter 8
8-14
BiPAP Vision Service Manual © Respironics, Inc.
1062788
Options and Upgrades
19. Perform the following procedures as described in Chapter 7:
•
Transfer the total operating hours to the upgraded ventilator.
•
Blower/valve calibration.
•
Run-in cycle.
•
System final test.
NOTE:
When you power up the upgraded ventilator, a
Check
Vent
error 301
may occur. Running a blower/valve calibration and cycling power will
clear this error.
20. When testing is complete, remove the test ribbon cable from MC
board, and install the top enclosure using the two 6-32 x 1/2 screws
provided in the upgrade kit.