SECTION 5
Pronar RC2100
5.37
5.10
STORAGE
•
Trailer should be kept in closed or roofed building.
•
If the machine will not be used for a long time, it is essential to protect it from
adverse weather, especially rust and accelerated tyre deterioration. During this
time trailer must be unloaded. Trailer should be very carefully washed and dried.
•
Corroded places should be cleaned of rust, degreased and protected using
undercoat paint and then painted with surface paint according to colour scheme.
•
In the event of prolonged work stoppage, it is essential to lubricate all elements
regardless of the period of the last lubrication process.
•
Wheel rims and tyres should be carefully washed and dried. During longer
storage of unused trailer it is recommended that every 2 to 3 weeks the machine
may be moved a bit so that the place of contact of tyres with ground is changed.
The tyres will not be deformed and maintain proper geometry. Also tyre pressure
should be inspected from time to time, and if necessary pressure should be
increased to appropriate value.
5.11
TIGHTENING TORQUE FOR NUT AND BOLT
CONNECTIONS
Unless other tightening parameters are given, during maintenance repair work apply
appropriate torque to tightening nut and bolt connections. Recommended tightening torque of
most frequently applied nut and bolt connections are given in table below. Given values apply
to non-lubricated steel bolts.
TAB. 5.6
Tightening torque for nut and bolt connections
5.8
(1)
8.8
(1)
10.9
(1)
THREAD
METRIC
Md [Nm]
M10
37
49
72
M12
64
85
125
Summary of Contents for RC2100
Page 2: ......
Page 6: ......
Page 11: ...SECTION 1 BASIC INFORMATION ...
Page 24: ...Pronar RC2100 SECTION 1 1 14 ...
Page 25: ...SECTION 2 SAFETY ADVICE ...
Page 41: ...SECTION 2 Pronar RC2100 2 17 FIG 2 3 Locations of information and warning decals ...
Page 42: ...Pronar RC2100 SECTION 2 2 18 ...
Page 43: ...SECTION 3 DESIGN AND OPERATION ...
Page 58: ...Pronar RC2100 SECTION 3 3 16 ...
Page 59: ...SECTION 4 CORRECT USE ...
Page 82: ...Pronar RC2100 SECTION 4 4 24 ...
Page 83: ...SECTION 5 MAINTENANCE ...
Page 113: ...SECTION 5 Pronar RC2100 5 31 FIG 5 12 Lubrication points part 1 ...
Page 114: ...Pronar RC2100 SECTION 5 5 32 FIG 5 13 Lubrication points part 2 ...
Page 123: ...NOTES ...
Page 124: ... ...
Page 125: ...ANNEX A Tyre dimensions LP AXLE FRONT REAR WHEEL BRAKE 1 215 75 R17 5 135 133 J 17 5x6 75 ...