Pronar RC2100
SECTION 4
4.2
4.1
PREPARING FOR WORK BEFORE FIRST USE
4.1.1 CHECKING THE TRAILER AFTER DELIVERY
The manufacturer guarantees that the trailer is fully operational and has been checked
according to quality control procedures and is ready for normal use. This does not release
the user from an obligation to check the machine's condition after delivery and before first
use. The machine is delivered to the user completely assembled.
Before commencing work, machine operator must inspect the technical condition of the trailer
and prepare it for test start-up. The user must carefully read this Operator's Manual and
observe all recommendations, understand the design and the principle of machine operation.
IMPORTANT!
Before proceeding to hitching to tractor the user must carefully read this Operator's
Manual and additional publications attached to machine and observe all
recommendations.
External inspection
Check completeness of machine (standard and optional equipment).
Check condition of protective paint coat and load platform planks.
Inspect trailer's individual components for mechanical damage resulting from
incorrect transport (dents, piercing, bent or broken components).
Check technical condition of tyres and tyre pressure.
Check technical condition of elastic hydraulic lines,
Check technical condition of pneumatic conduits,
Check that there are no hydraulic oil leaks.
Check electric lamps.
Summary of Contents for RC2100
Page 2: ......
Page 6: ......
Page 11: ...SECTION 1 BASIC INFORMATION ...
Page 24: ...Pronar RC2100 SECTION 1 1 14 ...
Page 25: ...SECTION 2 SAFETY ADVICE ...
Page 41: ...SECTION 2 Pronar RC2100 2 17 FIG 2 3 Locations of information and warning decals ...
Page 42: ...Pronar RC2100 SECTION 2 2 18 ...
Page 43: ...SECTION 3 DESIGN AND OPERATION ...
Page 58: ...Pronar RC2100 SECTION 3 3 16 ...
Page 59: ...SECTION 4 CORRECT USE ...
Page 82: ...Pronar RC2100 SECTION 4 4 24 ...
Page 83: ...SECTION 5 MAINTENANCE ...
Page 113: ...SECTION 5 Pronar RC2100 5 31 FIG 5 12 Lubrication points part 1 ...
Page 114: ...Pronar RC2100 SECTION 5 5 32 FIG 5 13 Lubrication points part 2 ...
Page 123: ...NOTES ...
Page 124: ... ...
Page 125: ...ANNEX A Tyre dimensions LP AXLE FRONT REAR WHEEL BRAKE 1 215 75 R17 5 135 133 J 17 5x6 75 ...