![PRONAR RC2100 Translation Of The Original Copy Of The Manual Download Page 86](http://html.mh-extra.com/html/pronar/rc2100/rc2100_translation-of-the-original-copy-of-the-manual_1617427086.webp)
Pronar RC2100
SECTION 5
5.4
5.2.3 CHECK WHEEL AXLE BEARINGS FOR LOOSENESS
FIG. 5.1
Lifting jack support point
(1) U bolt
PREPARATION PROCEDURES
Hitch trailer to tractor, braking tractor with parking brake.
Park tractor and trailer on hard level ground.
Place securing chocks under one trailer wheel. Ensure that trailer shall not
move during inspection.
Raise front wheel (opposite to the side where chocks are placed).
The lifting jack should be placed under the axle between U bolts (1)
Figure (5.1) securing axle to shock absorber leaf springs, or as near
as possible to axle mounting. Recommended fulcrum is marked with
an arrow. Lifting jack must be suited to weight of trailer.
Summary of Contents for RC2100
Page 2: ......
Page 6: ......
Page 11: ...SECTION 1 BASIC INFORMATION ...
Page 24: ...Pronar RC2100 SECTION 1 1 14 ...
Page 25: ...SECTION 2 SAFETY ADVICE ...
Page 41: ...SECTION 2 Pronar RC2100 2 17 FIG 2 3 Locations of information and warning decals ...
Page 42: ...Pronar RC2100 SECTION 2 2 18 ...
Page 43: ...SECTION 3 DESIGN AND OPERATION ...
Page 58: ...Pronar RC2100 SECTION 3 3 16 ...
Page 59: ...SECTION 4 CORRECT USE ...
Page 82: ...Pronar RC2100 SECTION 4 4 24 ...
Page 83: ...SECTION 5 MAINTENANCE ...
Page 113: ...SECTION 5 Pronar RC2100 5 31 FIG 5 12 Lubrication points part 1 ...
Page 114: ...Pronar RC2100 SECTION 5 5 32 FIG 5 13 Lubrication points part 2 ...
Page 123: ...NOTES ...
Page 124: ... ...
Page 125: ...ANNEX A Tyre dimensions LP AXLE FRONT REAR WHEEL BRAKE 1 215 75 R17 5 135 133 J 17 5x6 75 ...