![PRIMERGY BladeFrame BF200 Initial Setup Manual Download Page 51](http://html1.mh-extra.com/html/primergy/bladeframe-bf200/bladeframe-bf200_initial-setup-manual_1601712051.webp)
Installing the Hardware
Release 5.0
3-13
b.
Secure the front of each rail to the rack using the screws
provided.
c.
Secure the back of each rail to the rack using the screws
provided.
d.
Secure the screws that attach the rear rail extenders to the
front part of the rails.
2.
If you are installing more than one BladeFrame BF200 in your
rack, leave a 1U gap between each chassis (see Figure 3.7.) This
allows for the subsequent installation of redundant power
supplies For more detail on installing redundant power supplies,
see “
Providing Redundant Input Power
Note:
The redundant power option is not available with systems
sold outside of North America.
5.
Mount the server (see
Installing the Chassis
).
6.
Route the cables as described in the original manual of the Rack.
Summary of Contents for BladeFrame BF200
Page 2: ......
Page 4: ......
Page 8: ...Initial Setup Guide cBlade ES vi...
Page 20: ...Initial Setup Guide cBlade ES 1 6 Release 5 0...
Page 78: ...Initial Setup Guide cBlade ES 4 14 Release 5 0...
Page 110: ...Initial Setup Guide cBlade ES 5 32 Release 5 0...