Initial Setup Guide cBlade ES
4-2
Release 5.0
Connecting the BladeFrame BF200 to a Power
Source
This section describes how to connect power to the BladeFrame
BF200.
After the BladeFrame BF200 is powered up, do not
power it off unless it is being moved or serviced.
Note:
If you are installing the BladeFrame BF200 outside the U.S.
or Canada, use the appropriate cord from the Internationalization kit.
Contact Fujitsu Siemens Computers customer support.
For your BladeFrame BF200 to be connected to a power source,
you must connect the four BladeFrame power cords to the NEMA
L6-20 receptacles from your 200/208 Volt, 30 amp power source.
(For the BladeFrame BF200 electrical specifications, see
Table 2.2.)
Indicator Lights
Each blade on the BladeFrame BF200 has an indicator light located
on the front panel, next to the handle.
Each blade can be in one of four states, as indicated by the lights:
Standby, Recognized, Active, and Selected. The main power and
circuit breakers must be on for the indicator lights to function.
Table 4.1
describes the meaning of each indication.
Table 4.1 Indicator Lights
Indication
Color
Meaning
Standby
Blinking amber
The blade has been successfully
inserted into the BladeFrame
BF200 and is receiving standby
power.
Summary of Contents for BladeFrame BF200
Page 2: ......
Page 4: ......
Page 8: ...Initial Setup Guide cBlade ES vi...
Page 20: ...Initial Setup Guide cBlade ES 1 6 Release 5 0...
Page 78: ...Initial Setup Guide cBlade ES 4 14 Release 5 0...
Page 110: ...Initial Setup Guide cBlade ES 5 32 Release 5 0...