![Porsche 2015 911 GT3 Cup Technical Manual Download Page 213](http://html1.mh-extra.com/html/porsche/2015-911-gt3-cup/2015-911-gt3-cup_technical-manual_1580085213.webp)
Bodywork
911 GT3 Cup (991)
MY 2015
Mounting the new part
The bottom cross member and the rivets at the upper end next to the strut dome are
used for positioning.
All surfaces that are riveted have also to be bonded with two-component glue.
Place and rivet the blind rivets connecting the new part to the body.
Make sure that two different rivet lengths are available.
Rivet connections through two sheets:
short rivets 3.0-6.5
Rivet connections through three sheets:
long rivets 5.0-8.5
The riveting points are shown below
4.15.1.18
NOTE
Version: 16.12.2014
212