3 ● Run a Job
3-9
SV63139 Rev. A
5. Aerate and fan the stack of
inserts to ensure the individual
pieces are not stuck together.
Loading orientation can vary
depending on the inserts being
run. As a general rule, load inserts
using the orientation guidelines in
the table below.
6. Let the wedge (material prop)
slide down behind the stack to
support the inserts.
Orientation Table for Loading Inserts
Insert Type
Orientation
Slip
Face up, bottom edge first
Reply Envelope
Face up, top edge first
Pre-Folded
Face up, closed edge first
Booklet
Face up, bound edge first
Summary of Contents for relay 2000
Page 6: ...This page is intentionally blank ...
Page 10: ...This page is intentionally blank ...
Page 20: ...This page is intentionally blank ...
Page 42: ...This page is intentionally blank ...
Page 54: ...This page is intentionally blank ...
Page 66: ...This page is intentionally blank ...
Page 68: ...This page is intentionally blank ...
Page 74: ...This page is intentionally blank ...
Page 82: ...This page is intentionally blank ...
Page 84: ...SV63139 Rev A This page is intentionally blank ...