
41
43
45
99
C4 Suspension on the Structure
Closing Gaps
Components
41
Foldable Cover (multi-layer
plywood sheeting)
43
Cover RCS 70 x 70
45
Slab Shoe RCS
1. Cover all gaps in the area of the Slab
Shoe with Cover RCS 70x70 (43).
(Fig. C4.07)
2. If necessary, nail the Cover on the
Foldable Cover.
Cover any remaining gaps with suitable
means, e.g. Elastomer cover strips.
Make sure that neither the climbing
procedure nor the opening of the flaps
is impaired in any way.
Fig. C4.07
RCS P Climbing Protection Panel
Instructions for Assembly and Use – Standard Configuration
Summary of Contents for RCS P
Page 13: ...13 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 93: ...93 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 101: ...101 RCS P Climbing Protection Panel Instructions for Assembly and Use Standard Configuration...
Page 169: ...169...